Infrastructure Engineering

CONTACT US +

  • Infrastructure Engineering
  • (941) 708-7450
  • Email Us

The Engineering Services business center is responsible for designing, modeling, engineering, and managing projects related to improvements to County infrastructure. Among other duties, the engineering staff is responsible for overseeing the County’s Capital Improvement Program and Infrastructure Projects from design all the way through to managing construction.

The Infrastructure Inspections Division is the arm of Public Works that inspects commercial and development projects, including vehicle access for all commercial projects. Infrastructure Inspections also inspects the horizontal construction aspects of all County projects.

Download the Infrastructure Inspections Request Form  (".docx" file format)

*Note: If you are requesting an inspection for a "Lift Station Startup" we require you to fill out the Lift Station Information Form. (".xlsx" file format)

Infrastructure Engineering oversees engineering, Computer-Aided Design (CAD) operations, design, plans review and permitting. The division also supports field maintenance traffic engineering and stormwater.

Growth Management Engineering

Growth Management Engineering (GME) reviews all preliminary site plans, final site plans, administrative and special permits and final construction drawing approval. GME oversees determination of review, inspection, testing and tap fees and the verification of payment.

The division also reviews as-built drawings and final plats to ensure compliance with County regulations and construction standards. It reviews and approves private and public construction cost estimates for issuance of performance and defect bonds. GME also provides engineering approval for Building Department Temporary Use Permits (TUP) and attends pre-application engineering reviews of future development for applicants.

Please find below a list of commonly referenced links and documents:

Highway Engineering

Highway Engineering designs capital and maintenance projects for roadways, drainage and bridge rehabilitation and replacement. The division works closely with other state and federal agencies, i.e., Florida Department of Transportation (FDOT). On average, this section designs approximately 15,000 linear feet of roadway per year.

Stormwater Engineering

This division monitors and improves Manatee County's stormwater system, while ensuring FEMA floodplain compliance. Stormwater Engineering is involved with capital improvement projects, including state and federal grant writing. This section is responsible for inspecting and reporting of county maintained stormwater facilities for the National Pollutant Discharge Elimination System (NPDES) permit compliance for the Environmental Protection Agency (EPA).

Stormwater Engineering also reviews No-Rise Certificates and floodplain compensation calculations. Additionally, Stormwater Engineering conducts floodplain studies with Southwest Florida Watershed Management District (SWFWMD), and oversees the floodplain map revisions prepared for and adopted by the Board of County Commissioners. On average, Stormwater Engineering provides 300 drainage-related engineering reviews annually.

Stormwater Engineering maintains a near real time stream elevation and rain sensor system.  There are 18 locations throughout Manatee County where data is collected in 15-minute intervals.

*Manatee County specifically disclaims any warranty, either expressed or implied, including, but not limited to, the implied warranties or merchantability and fitness for a particular use. The entire risk as to quality and performance is with the user. In no event will Manatee County or its staff be liable for any direct, indirect, incidental, special, consequential, or other damages, including loss of profit, arising out of the use of these data even if the County has been advised of the possibility of such damages.

Here's a list of commonly referenced links and documents:

Utility Engineering

This section oversees Engineering Design Services and Development Review.

Design Services designs capital infrastructure and maintenance projects for potable water, wastewater and reclaimed water. It also oversees Manatee County's water and wastewater infrastructure. Utility Engineering works closely with the Manatee County Health Department and the Florida Department of Environmental Protection (FDEP) to ensure compliance with all regulations and design standards for our utility infrastructure.  On average, this section has 30 projects under design at any time.

Design Services is Manatee County Government's primary point of contact for FDOT and other utilities to find and resolve conflicts between existing and proposed utility infrastructure.  We also work hand-in-hand with County utility field crews to help size pumps, to resolve flow problems and to review proposed new methods or materials.

Development Review provides a number of professional engineering support services for Manatee County development projects including:

  • Reviewing construction plans and associated documents of potable water, wastewater and reclaimed water utilities for residential, commercial and industrial development projects. These plans are reviewed for compliance within local codes and standards and within state regulations to ensure that the utilities infrastructure in Manatee County is constructed to standards that will serve our citizens for many years to come.
  • Ensuring that utility services for applications for Building Department Permits are adequately sized, and subsequently issue associated water meter releases.
  • Responding to citizen requests related to water, wastewater and reclaimed water connections and utility line extensions.

Manatee County Meter Sizing Form.

Public Works Standards

Manatee County Public Works is now offering Engineering Standards online. Both the Adobe pdf and the AutoCad 2004 dwg file types have been made available for download. These documents are large and downloading time will vary based on your connection.


 

‚Äč